by David D | Jul 6, 2021 | News
Expands LPS technology, project and talent base NEW BEDFORD, MA – Littoral Power Systems, Inc. (LPS) announced today the acquisition of Cook Hydro Solutions, Inc. (CHI), an Ohio-based designer, manufacturer and installer of water power equipment. LPS will add CHI’s...
by David D | Apr 12, 2021 | Installations, News
Grand Coulee, the second largest dam in the world stands 550 feet tall, is 500 feet thick at the base, and just 57 feet shy of a mile long. She has 6.8 million kilowatts of power capacity from her 33 generators producing about 21 billion kWh of power each year. That...
by David D | Apr 12, 2021 | Installations, News
134 year old earthen dam with concrete spillway. Overgrown with trees and vegetation. Portions crumbling off both sides. To breech or not to breech? Remove or repair/replace? These are the questions being debated in towns across the nation as they try to figure out...
by David D | Apr 12, 2021 | News
We are honored to have been invited as one of five participating groups in Oak Ridge National Laboratories’ workshop on Standard Modular Hydropower. The workshop, hosted by ORNL, brought together over a dozen scientists and engineers from one of the nation’s top...