by David D | Apr 17, 2022 | Uncategorized
Test
by David D | Jan 4, 2022 | Installations
by David D | Jul 6, 2021 | News
Expands LPS technology, project and talent base NEW BEDFORD, MA – Littoral Power Systems, Inc. (LPS) announced today the acquisition of Cook Hydro Solutions, Inc. (CHI), an Ohio-based designer, manufacturer and installer of water power equipment. LPS will add CHI’s...
by David D | Apr 12, 2021 | Installations, News
Grand Coulee, the second largest dam in the world stands 550 feet tall, is 500 feet thick at the base, and just 57 feet shy of a mile long. She has 6.8 million kilowatts of power capacity from her 33 generators producing about 21 billion kWh of power each year. That...
by David D | Apr 12, 2021 | Installations, News
134 year old earthen dam with concrete spillway. Overgrown with trees and vegetation. Portions crumbling off both sides. To breech or not to breech? Remove or repair/replace? These are the questions being debated in towns across the nation as they try to figure out...